Abstract

In order to make the inspection of nuclear facilities effective, mutual understanding and respect between the regulatory body and the licensees, NISA has been made considerable efforts open and yet formal relationship shall be fostered. For example, Inspection and optimization of Nuclear Safety Regulation meeting has been held at NISA from 2005, where academic, regulatory and industrial members, such as JSME had frankly discussion for the improvement of inspection system. Based on the agreed on the necessity of system renovation, the optimal inspection system, suitable plant shutdown interval for the preventive maintenance was evaluated considering the current monitoring technique. The useful conclusions were published so that each member makes efforts for the effective inspection system. And this year, NISA will start the new maintenance system, and inspection that is improved not also during outage but also the startup and rated operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.