Abstract

When the large-capacity Mold type Transformer was passed through rain, after it was dried and it’s parts were changed, Insulation Diagnosis was made to evaluate the condition of it and decide to recharge. Using the evaluation of Insulation Diagnosis, the urgent decision-making for recharge made blackout time minimum. In this study, it was considered that Insulation Diagnosis for the large-capacity Mold type Transformer is applied to decision-making for reuse of high voltage electric power equipment by analysis of the case study.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.