Abstract

The development of international trade implies the use of the territory of Central Asia as a transit zone, through which the routes China–Europe, China – the middle East should be laid. The existing communication capabilities are not enough, so new directions are being developed (Railways “China–Kazakhstan – Turkmenistan–Iran”, “Turkmenistan– Afghanistan–Tajikistan”, ”China–Kyrgyzstan–Uzbekistan”; multimodal transit corridors” Lazurit”,” TRANS – Caspian international transport route”; such highways as “Western China– Western Europe”). However, paved roads, both rail and road, do not always meet expectations in terms of the volume of cargo passing through them (projects “China – Kazakhstan – Turkmenistan – Iran” and the Lapis lazuli corridor). Their loading is delayed “until better times” either due to the unstable political background, or due to the lack of necessary commodity flows in both directions. In some cases, there is a lack of political will to make appropriate decisions. Finished projects are unprofitable. None of the international transit projects announced or even completed over the past 20 years through the Central Asian republics has been fully operational. Meanwhile, international transit allows not only to fill the state budget, but also to solve issues of internal connectivity of territories. This task is most relevant today for Kyrgyzstan and Tajikistan, which have become hostages of their own geography, with localities separated by impassable mountain ranges.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call