Abstract
A coupled tide-surge model, which has been evaluated the utility in the previous study, is applied for simulating the inundation phenomena. The coupled model system adopts the hydrodynamic module of MIKE21 software, and the study area is identical to the previous study. The only difference is additional detailed areas for simulating inundation. An artificial scenario of a virtual typhoon striking Mokpo coastal zone at spring high tide is simulated. Then the calculated water level corresponds to the extreme high water level(556 cm) for 100 year return period. The result also shows the inundation depth is 50~100 cm not only near the Mokpo Inner Port but also near the Mokpo North Port. Finally, the coastal inundation prediction map is drawn on the basis of inundation simulation results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Korean Society of Coastal and Ocean Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.