Abstract
The paper proposes a method for calculating the project line on the rise. A combination of individual sections with different slopes of the project line is considered, which ensures that the timber carrier can overcome the rise, if possible, in a direct drive. The given method of calculating the project line on the ascent makes it possible to quickly, without complicated calculations, choose the best options for the project line, ensuring maximum use of the vehicle with minimum fuel consumption. It is advisable to recommend the mentioned calculation method to design organizations for the design of a longitudinal profile in a broken area.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.