Abstract

Abstract : An analysis of the main factors and its degree of impact on power production is performed against the landfill gas power plant in S landfill site. The number of normal operation (50 MWh & 24 hr) days was 70.9% to the total number of operation days from 2007 to 2014, and the percentage of the actual power production was 79.3% of 3,428,400 MW which is the theoretical maximum estimation. The ratio of factors that accounted for the efficiency of power production are: 44.0% of repairing of the defect and regular servicing, 37.4% of cut-down operation due to hydrogen sulfide, and 18.6% of air pre-heater washing, respectively. Yet, considering that the cut-down operation due to hydrogen sulfide was carried out for only two years, the high concentration of hydrogen sulfide was the most influential factors on landfill gas power production. The long-term power production was analyzed as 35.9 MWh in 2018, and the constant drop is anticipated, resulting in 16.6 MWh by 2028, and under 8.4 MWh in 2038.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.