Abstract

In this paper, considering the electric power generation characteristics of variable renewable sources(VRS) due to the dependence on the weather conditions the factors that would limit the increasing penetration level of VRS in the power system are analyzed, and then the method for evaluating the steady-state penetration limit of VRS is presented for each factor. In addition, through study cases employing the planning data developed from the 9th Basic Plan for Long-term Electricity Supply and Demand and historical operation data of Korean power system, the effectiveness of the proposed method is verified.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.