A foundation pit is constructed in the floodplain of Yangtze River, and a deep and thick layer of large-particle pebble gravel exists below the base slab, thus forming a connected supply channel with the adjacent Yangtze River. The large water volume, high water pressure, and strong permeability of this layer bring great risks to the foundation pit construction. In view of the fact that conventional waterproof curtain construction technologies such as the deep mixing column and high-pressure jet grouting column cannot meet the engineering requirements under these kinds of geological and environmental conditions, a new waterproof curtain construction technology that combines the trenching technology of the diaphragm wall with the TRD (Trench cutting Remixing Deep wall) technology is proposed, i.e., the trenching-and-replacing-style TRD technology, as well as the construction process of this technology, is presented. After the waterproof curtain is built using the proposed technology, the strength, integrity, uniformity, and service performance of the waterproof curtain wall are tested and evaluated by the comprehensive methods of coring, borehole television imaging, resistivity CT, and a group well pumping test. The results show that the proposed technology overcomes the adverse effects of underlying large-particle pebble gravel layer, and the waterproof curtain built by it effectively cuts off the hydraulic connection inside and outside the pit. The technical proposal can provide useful references for similar projects.
Read full abstract