In this report the overview of activity at existing and future electron-positron high energy colliders at BINP is presented. VEPP-2000 and VEPP-4M electron-positron colliders are currently being in operation at the Budker Institute of Nuclear Physics in Novosibirsk. These two machines cover a wide collision energy range: from 0.32 GeV to 2 GeV (VEPP-2000) and from 1.8 GeV to 11 GeV (VEPP-4M). Both complexes will be upgraded after successful start of operation in 2013 of the new electron-positron injector complex VEPP-5, which should supply both facilities by much more intense beams. Super-tau-charm factory waits for the final government's approval being considered as one of 6 mega-science project in Russia.
Read full abstract