AbstractThe operating characteristics and operation procedure of the closed‐loop experimental facility under subsonic power generation have been investigated by means of time‐dependent quasi‐one‐dimensional numerical simulations. Two ways of operation for subsonic power generation were found: (1) subsonic operation both under nonpower and power generation and (2) supersonic operation under nonpower generation and subsonic operation under power generation. For operation (1), Mach number at channel inlet decreases to ∼0.6, therefore it is required to generate plasma under this Mach number. On the other hand, if the plasma cannot be generated, operation (2) needs to be carried out. In this case, a shock wave appears in the generator channel, then the influence of a large pressure change and a vibration caused by a shock wave in the generator channel needs to be considered. © 2008 Wiley Periodicals, Inc. Electr Eng Jpn, 163(1): 25–33, 2008; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/eej.20399