AbstractIn 2013, the Austrian Society for Geomechanics published the Guideline for the Geotechnical Design of Underground Structures with TBM Excavation. The Guideline contains general procedures for the geotechnical design and construction. In the design phase, the first steps are evaluating different ground conditions by classifying different ground types, different ground behaviours, their categorization into ground behaviour types, and the determination of construction measures derived from the ground behaviour. On this basis the expected system behaviour in each system sector of the tunnel boring machine (TBM) is predicted and described in detail to enable comparison in the construction phase. In the construction phase, geotechnical relevant ground parameters as well as observations regarding the actual system behaviour are recorded and compared with the assumptions of the design. The geotechnical design is updated continuously based on the encountered ground conditions and geotechnical observations. The improved quality of the geotechnical model allows an optimization of the construction while meeting all safety and environmental requirements. In the first part of the article, the general procedures of the guideline are described and parameters to describe the system behaviour in each system sector adequately are listed. In the second part of the article, the implementation of the guideline during design and construction at the Semmering Basetunnel in Austria is described.