The nuclear energy industry has seen a resurgence due to interest in sustainable energy. Regulatory agencies are evaluating innovative technology and facility designs for the first time in a long time. The nuclear energy business needs a workable instrument for decision-making in light of the shift in public and regulatory opinion. This study has two main motivations. The first is to determine the set of criteria to be used in determining suitable locations for a nuclear power plant (NPP) to be established in Turkey and to determine suitable regions with Analytic Network Process (ANP) based analyzes in the light of these criteria. The second is to select the most suitable nuclear reactor type for the specified location. Plant efficiency and lifetime vary depending on the reactor type used. For this reason, in the study, both the location of the nuclear power plant and the selection of the appropriate reactor type for the plant were evaluated together. In this context, a criterion set consisting of 3 main criteria and 20 sub-criteria to be used in NPP installation location and reactor selection was determined. In the study, site selection was made by focusing on economic, social and technical factors, and reactor selection was made by focusing on technical factors. Giresun, Trabzon, Rize and Artvin provinces located in the Eastern Black Sea region were evaluated for NPP installation. For reactor selection, we focused on reactor types according to their coolants and in this context, PWR, PHWR, GCR and BWR reactors were examined. NPP location and reactor selection in the study; It was realized as Giresun (PWR) > Rize (PWR) > Trabzon (BWR) > Artvin (BWR).
Read full abstract