Wind curtailment, caused by wind power uncertainty, has become a prominent issue with the large-scale grid connection of wind power. To fully account for the uncertainty of wind power output, a short-term hydro-wind-thermal operation method based on a wind power confidence interval is proposed. By utilizing the flexible start-stop and efficient ramp-up of cascade hydropower plants to smooth fluctuations in wind power output, a multi-objective optimal scheduling model that minimizes the cost of power generation and maximizes the consumption of clean energy is constructed. To reduce the solution’s complexity, we chunk the model according to the energy type using a hierarchical solution. The overall solution framework, which integrates a nonparametric method, a heuristic algorithm, and an improved particle swarm algorithm, is constructed to solve the model rapidly. The simulation results of a regional power grid show that the proposed method can attain an efficient solution in 83.5 seconds. Furthermore, the proposed method achieves an additional 455,600 kWh of hydropower and a reduction of ¥233,300 in the cost of coal consumption. These findings suggest that the proposed method is a good reference for the short-term operation of a hydro-wind-thermal combination in large-scale wind power access areas.
Read full abstract