Over the last few years we have been facing many problems related to the Occupational Health and Safety, Environmental Safety and Quality in construction sites during the execution of project. Now-a-days the clients need the work to be done with full quality in safety manner. This Paper explains the “Integrated Management System (IMS)”. which integrates various departments like Execution, Planning, Design, Occupational health and safety, Environmental Safety, Human Resources, Quality Assurance/Quality Control etc., according to standards such as ISO 9001, uISO 14001 and OHSAS 18001. This IMS is one of emerging techniques that brings all the departments into a single one. This study was done by collecting the data by conducting interviews with professionals from all the departments in the Steel Melt Shop Construction Project such as Human Resource team, Design team, Procurementlteam, Execution Team, Quality team, Safety team etc. This Paper concludes with a detailed framework of IMS for a steel Melt shop Project by integrating the functions of various departments in the project and develops a basic plan of IMS for both Top level Management and Bottom Level Management. This IMS Plan has been Prepared for Contractors, its sub-contractors and other Stack holders if any involving in this project. This Integrated management system will minimize the overall cost, time and manpower.
Read full abstract