The article presents the results of the examination of the technical condition of part of the construction structures of the building damaged as a result of a missile strike, the determination of the characteristics and classification of their defects and damage, the provision of conclusions and recommendations regarding the correction of the life cycle and further safe and reliable operation of the building. As part of the study, the object of the survey was a monolithic 22-story residential building with a basement (ATP) floor and a complex configuration in plan. The structural scheme of the complex is a monolithic reinforced concrete frame with stiffening cores. The stability and rigidity of the frame is ensured by diaphragms of stiffness in the form of reinforced concrete walls, elevator-stair nodes and rigid nodes connecting pylons and horizontal disks of monolithic reinforced concrete floor slabs. During the examination, visual and instrumental methods of research were performed. Before the field work, measures were taken to collect design and archival information about the research object. Instrumental studies to determine the actual concrete strength of reinforced concrete frame elements and to determine the diameter, protective layer and pitch of the working rods of the reinforcing frames of the load-bearing elements were carried out by non-destructive methods. The calculation model of the spatial scheme of the structure of the frame of the residential building, taking into account the damage, was made in the subsystem (PS) "COMPOSITION" of the software complex (PC) "MONOMAH CAD". The result of the survey is conclusions and recommendations, which indicate the specifics of damage and types of defects, destruction and debris in various structural elements that were discovered during the survey. The general technical condition of the residential building is classified as emergency. As for the recommendations, two options for carrying out repair and restoration works were provided. The first option is to restore the plan-elevation position of the building, the design marks of vertical and horizontal structures and the unloading of overloaded structures, to be performed with the help of an automatic hydraulic complex. The second option is the arrangement of temporary strengthening of emergency structures with the help of a metal space frame, without restoring the planned height position of the residential building.
Read full abstract