In the materials of the article, examples of calculations and selection of a technological complex for drilling a well with a depth of 5650 m are considered, a complex of mechanization and partial automation of lowering and lifting operations during well drilling is analyzed, the advantages of such systems are established compared to installations that are not equipped with a complex of ASP mechanisms. The justification of the feasibility and economic efficiency of the introduction of the proposed technical solutions for the development of a device for limiting the movement of the melting unit of the drilling rig was carried out, its principle and electrical diagrams were proposed, the technical feasibility was substantiated, and the economic effect of the implementation of the developed design of the device for limiting the movement of the melting unit was calculated. The components of the developed methodology for calculating energy costs and machine time costs during SPO by lifting complexes are presented, an assessment of the perfection of lifting complexes of drilling rigs with different drives in terms of machine time costs of lifting a drill string for a well drilling cycle, an assessment of the perfection of lifting complexes of drilling rigs with different drives in terms of energy consumption rise of the drill string during the well drilling cycle. The materials of the article consider examples the calculation and the chosen technological complex for wells drilling with the depth of 5650 m, analyses the complex of mechanisms to mechanise and partially automate lowering-lifting operations while wells drilling and establishes advantages of such systems, comparing to the sets not equipped with the complex of mechanisms ALL.
Read full abstract