The analysis for estimating operator’s activity and quantity of information in control rooms of underground coal mines is presented in this paper. Monitoring of operators in control rooms was conducted in mines Rembas, Soko, Ibar, Jasenovac and Stavalj. The network models are used during the analysis of operator’s activity in control rooms. The result of the analysis is proposed critical path network model. The application of network models improves the quality and level of research, making it more efficient. Most of the analysed information are related to normal and alarm state data received from the mine shaft and operator’s response to this data. Results are given according to actual scope of work depending on the work dynamics in underground coal mines, via histogram of changes in average number of activities per 1 h for 24-h period, then number of operator’s activities per work hour and insight into the global view of technological process in the coal mine with focus on the work scope of mine workers. Analysis of operator’s activities presented in this paper determines the relations between devices in control rooms and operators’ capabilities in order to get better ergonomic design of control rooms.