Instead of slip stacking, an alternate method of doubling the linear intensity of the Fermilab Main Injector is discussed. This method makes use of rf barriers to transfer 12 booster batches from the Fermilab Booster to the Main Injector in 12 consecutive booster cycles, totaling 800 ms. After that, adiabatic capture of the beam into 53 MHz buckets can be accomplished in about 10 ms. Because the beam is debunched during the injection process and no rf voltage is required, the beam loading voltages in the rf cavities are small and can be eliminated by a combination of counterphasing and mechanical shorts.