BackgroundNowadays, large benign lateral spreading lesions (LSLs) and sessile polyps in the colorectum are mostly resected by endoscopic mucosal resection (EMR). A major drawback of EMR is the polyp recurrence rate of up to 20%. Snare tip soft coagulation (STSC) is considered an effective technique to reduce recurrence rates. However, clinical trials on STSC have mainly been conducted in expert referral centers. In these studies, polyp recurrence was assessed optically, and additional adjunctive techniques were excluded. In the current trial, we will evaluate the efficacy and safety of STSC in daily practice, by allowing adjunctive techniques during EMR and the use of both optical and histological polyp recurrence to assess recurrences during follow-up.MethodsThe RESPECT study is a multicenter, parallel-group, international single blinded randomized controlled superiority trial performed in the Netherlands and Germany. A total of 306 patients undergoing piecemeal EMR for LSLs or sessile colorectal polyps sized 20–60 mm will be randomized during the procedure after endoscopic complete polyp resection to the intervention or control group. Post-EMR defects allocated to the intervention group will be treated with thermal ablation with STSC of the entire resection margin. Primary outcome will be polyp recurrence by optical and histological confirmation at the first surveillance colonoscopy after 6 months. Secondary outcomes include technical success and complication rates.DiscussionThe RESPECT study will evaluate if STSC is effective in reducing recurrence rates after piecemeal EMR of large colorectal lesions in daily clinical practice performed by expert and non-expert endoscopists. Moreover, endoscopists will be allowed to use adjunctive techniques to remove remaining adenomatous tissue during the procedure. Finally, adenomatous polyp recurrence during follow-up will be defined by histologic identification.Trial registrationClinicalTrials.gov NCT05121805. Registered on 16 November 2021. Start recruitment: 17 March 2022. Planned completion of recruitment: 31 April 2025.