PurposeThis paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.Design/methodology/approachThis paper relies on grounded theory and data collection from two case studies – one in the public sector and one in the private sector – and is underpinned by Leavitt’s (1964) sociotechnical model.FindingsFindings reveal four new dimensions of stakeholder management as being affected through BIM-induced changes: commitment; transparency; learning and experience; and stakeholder satisfaction, with these extending beyond the dimensions recognised in the existing literature. Another novelty lies in bringing to light the highly context-specific nature of BIM-induced changes pertinent to stakeholder management, with the two case studies demonstrating differences in these changes. Furthermore, a theoretical model of the causal impacts of various identified dimensions is presented, in which the sequence of changes and the causal associations between the identified dimensions are conceptualised.Originality/valueThrough Leavitt’s (1964) Diamond lens, the procedure of change and its evolutionary procedure for various components of the sociotechnical system of stakeholder management are theorised. The tentative conceptualisations presented offer a springboard from which to further investigate the episode of change pertinent to various dimensions of stakeholder management in BIM-enabled projects.