Abstract As the number of low-production and low-efficiency wells in Chang Qing gas field increases gradually, and the problems of pipeline liquid accumulation, freezing plugging and leakage due to production with liquid are worsening, in view of the low efficiency of manual analysis of abnormal pipeline status, the difficulty of timely detection of potential problems and the labor intensity of manual blockage clearing operation, we study an automatic pipeline clearing technology applicable to medium- and low-pressure gas pipelines in the gas field, which mainly includes pipeline operation status analysis and early warning system and automatic pipeline clearing device. An analysis and warning algorithm module is proposed to analyze, warn and locate the frozen plugging point based on pipeline pressure, differential pressure and flow parameters in real time. A low and medium pressure balling device is designed to achieve the goals of intelligent control, pressure isolation balling and safe operation through mechanical structure design, automatic control system and safety protection system. The device and system are applied in the well field at the end of 1 and 3# trunk pipelines of Shen Mu Gas Field Station 7, which verifies the feasibility, accuracy and stability of the technology. Based on the joint operation of the pipeline analysis and warning system and the automatic pipeline clearing device, it is able to meet the remote intelligent pipeline clearing operation and pipeline maintenance tasks in the process of gas gathering and transmission in the gas field.
Read full abstract