This paper discusses the implementation considerations of Balanced Mix Design (BMD) in both design and production phases according to the recent experience from the agency and a contractor in Vermont since BMD was implemented by Vermont Agency of Transportation (VTrans) in 2019. In the design, the sensitivity of selected performance tests to mix design factors and the impact of asphalt binder source are two important aspects to consider as both agency and contractor need to understand the implications on the potential change of mix compositions. There are also several critical things to consider if BMD is implemented in production, including but not limited to the impact of production variation, the difference between design and production, and so forth. A case study through a VTrans pilot project constructed in 2020 season is discussed to demonstrate the importance of these considerations.
Read full abstract