With the increase of the flood discharge capacity of the flood discharge structure, the size of the flood discharge orifice is widened, which leads to the increasing thrust of the radial gate. A large tensile stress zone will be formed at the connection between the anchor block and the pier, which may lead to concrete cracking. The optimization design of the prestressed anchor cable of the pier has always been a concern of the engineering community. In this paper, the left pier of Jinchuan Hydropower Station is taken as the research object, and the finite element simulation model is established. The layout position of prestressed anchor cable is optimized, and different layout schemes of prestressed anchor cable on the left pier are designed and calculated. The results show that when the amount of main anchor cable is the same, it should be arranged outside the pier as far as possible; under the condition that the number of main anchor cables on the inner side of the pier is constant, when the direction of the main anchor cable force is consistent with the direction of the radial gate thrust, the main anchor cable prestress plays the greatest role; the arrangement of balance cable has no obvious effect on the tension of concrete at pier neck. It can provide reference for structural design.
Read full abstract