This study investigated the use of biochar, derived from a wood gasifier, in semi-dry anaerobic digestion of organic fraction of municipal solid waste (OFMSW). The experiment was conducted in three phases, without biochar and changing the hydraulic retention time (HRT) from 50 to 15 days until first acidification condition (on pH = 6.5), with biochar at an optimal concentration of 30 g/L in HRT= 20–10 day. Also, countermeasures for the acidified reactor with biochar during the dormancy period were investigated. The results demonstrated that adding biochar led to a rapid recovery of the acidified reactor, improved stability parameters, and removed foaming as a disturbance. Biochar addition (30 g/L) enhanced the organic loading rate (OLR) up to 11 kgVS/m3.day with an HRT of 20 days leading to specific methane production of 383 L/kgVS and a volumetric production increase of biomethane by 85 %. However, at higher OLRs with HRT of 10 days, acidification condition resurfaced leading to homogeneous foaming. Excess adding of biochar did not have significant treatment effects but necessitated a no-feeding period (about 45 days) and gentle stirring with long intervals for stable conditions. Overall, the use of biochar along with the OFMSW biogas plant was demonstrated to enhance production efficiency.
Read full abstract