Abstract

The zinc and copper content of roof runoff could originate from different sources such as dry and wet deposition and the corrosion of the material. The zinc runoff rate from a galvanized surface depends on the corrosion products formed during the dry days, the rain intensity and roof slope, which determinates the contact time. In the present study the contact time dependence of zinc rate and the re-dissolution of the zinc were investigated with steeping tests and a pilot study. The average zinc runoff measured in the first 2.8 l of runoff was 3.8 mg m(-2) (1.1-8.4 mg m(-2)), while in the following samples 1.2 mg m(-2) were detected. These results are in accordance with the 5-10 min, and 40-60 s contact time laboratory steeping test, respectively, which are realistic. The estimated specific yearly zinc runoff rate was 0.7 g m(-2)y(-1), while the dry and wet deposition rate of copper was 0.009 mg m(-2)d(-1) and 0.053 mg m(-2)storm(-1) respectively. The re-dissolution of the zinc from the evaporated then re-filled samples of leaching tests with high initial zinc content was just 60% after 60 min.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.