Abstract

This paper introduces the cross-sea water transmission pipeline project from Zhenhai to Mamu section of Zhoushan Continental Water Diversion Project Phase III, and summarizes the towing method of the nearshore section of the pipeline laying, the S-Lay, Post-trenching technology and concrete chain row installation construction techniques. Through the summary of the paper, it is expected to provide help for the construction of the sea bottom pipeline for island water supply in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.