Abstract

<p>The Yi Sun-sin Bridge is a three-span suspension bridge links the Yeosu National Industrial Complex to the Gwangyang International Port in South Korea. This bridge, currently under construction, will be the first constructed long span suspension bridge with a center span over 1000m in Korea. The bridge consists of twin box girder with a main span of 1545m, two main cables 700mm in diameter, two concrete pylons 270m in height, and rock-anchored and gravity-type anchorage.</p><p>In order to open the bridge temporarily before the world EXPO to be held in Yeosu in May of 2012, the construction period should be reduced by five months. To reduce the construction period, the legs of the pylon were constructed using a slip-form method and precast cross-beams were installed by means of a heavy lifting method.</p><p>This paper presents the construction planning of pylons to improve the speed of the slip-form work. In addition, geometry control of the pylons, the concrete supply system and the erection of the cross-beams between the pylons as constructed by the heavy lifting method are briefly discussed with their field applications for the accelerated construction plan.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.