Abstract
A heterogeneous network, where a switched Ethernet backbone interconnects several existing CAN buses via bridges, is a promising candidate to build a large scale network. For real-time applications, deterministic communication is a key issue. A worst-case delay analysis on such a network has to deal with heterogeneity properties, such as different bandwidths, scheduling policies and bridging strategies. In this paper, two approaches are proposed. The first one is based on a hierarchical component-based approach. The second one is an adapted Trajectory approach which integrates heterogeneity properties. Moreover, pessimism introduced by the adapted Trajectory approach is analyzed and an optimization of this approach is proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.