Abstract

On two-lane, two-way highways, pavement resurfacing is usually done by closing one lane at a time. Then, vehicles travel in the remaining lane along the work zone, alternating directions within each control cycle. Such a work zone can be analyzed as a one-way traffic-control system in which queuing and delay processes are analogous to those at a two-phase signalized intersection. Efficient scheduling and traffic control through work zones may significantly reduce the total cost. A model is presented for optimizing work plans, including zone lengths, work durations, starting times, pausing times (if any), and control-cycle times, for work zones on two-lane highways. This is done by minimizing total cost, including agency cost (maintenance cost and idling cost) and user cost (user delay cost and accident cost), while taking into account traffic-demand variations over time. Two optimization methods, Powell's and simulated annealing, are adapted for this problem and compared. In numerical tests, the simulated annealing algorithm yields better solutions using less computer time than Powell's method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.