Abstract
Several solutions have been proposed for the workload balancing in manual assembly lines with workers’ task assignment. Facing the case study of a sheet metal assembly line of transport pallets, the paper addresses the problem of the dynamic task assignment. The walking path minimization is considered in the problem, together with task sequence constraints. A real-time simulation allows to test the solution variations before their implementation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have