Abstract
The Uddevalla Volvo plant represents a different paradigm for automotive assembly. In parallel-flow work, self-managed work groups assemble entire automobiles with comparable productivity as conventional series-flow assembly lines. From the perspective of the demand-control model, operators at the Uddevalla plant have low physical and timing demands, high psychological demands because of increased duties and high-decision latitude due to varied and complex skills utilized, the two latter characterizing active work. Operators at standard assembly lines have higher levels of physical and timing demands, lower levels of psychological demand, and lower control, characterizing high-strain work. Active work is related to lower incidence of heart disease than high-strain work.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.