Abstract

Risk is the possibility of the occurrence of an event outside of which every activity that is likely to be detrimental is carried out by humans. In the Nangarasong Steel Frame construction project in Flores district, there is uncertainty which will create a risk that can encourage the project and can affect the potential for work accidents. Uncertainty factors can cause risk in an activity that has an impact on decreasing labor productivity, risk of cost, time, and damage to design or technology. To reduce these adverse impacts, a risk management system is needed, which includes analysis, analysis, and monitoring of risks that may occur. Risk management makes an integrated effort to manage the risk of work accidents by using the FMEA (Failure Mode And Effect Analysis) method. All construction projects that may experience accident risks are identified and analyzed for the severity with FMEA, from the results of which the causes and impacts of the work accident risks will be sought. After knowing and the impact of the risk of work accidents, the next action on the risk of work accidents that result.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call