Abstract

<p>A 312.5m long and 12.1m wide prestressed concrete box bridge is currently under construction in Wiwili, northern Nicaragua. The 125m main span will be erected by balanced cantilever method from two double wall piers 10m and 12m high. The design introduces some innovation in the classic balanced cantilever type by adopting external tendons for the second stage prestressing cables.</p><p>Challenging seismic risk, Wiwili bridge is designed to endure 0.43g peak ground acceleration. Different risk scenarios including a frequent event of 150-year return period – bridge to remain within the quasi-elastic range with no damage – and design event of 1350-year return period have been considered. The ductility capacity of the main span pier walls and the hysteretic damping provided at the plastic hinges has been assessed with the displacement demand. Additionally, isolating LRB bearings have been considered at the abutments and pier P1.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.