Abstract

The paper considers the problem of hard rock blasting in confined space of railway reconstruction with widening of side-hill cuts or shelves. To ensure reliable blasting without fly rock to construct the secondary railway tracks, it is proposed to use a combination of borehole cushioned charge construction in overdrilling, large delays in explosive initiation, as well as installation of permeable convertible shelters from elastic elements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.