Abstract

We propose a simulated annealing based zero-skew clock net construction algorithm which works in any routing space, from Manhattan to Euclidean, with the added flexibility of optimizing either the wire length or the propagation delay. We first devise an O(1og n) tree grafting perturbation function to construct a zero-skew clock tree under t he Elmore delay model. This tree grafting scheme is able to explore the entire solution space asymptotically. A Gauss-Seidel iteration procedure is then applied to optimize the Steiner point positions. Experimental results have shown that our algorithm can achieve substantial delay reduction and encouraging wire length minimization compared to previous works.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.