Abstract

Combined with high-rise frame-shearwall building of the International Education Center Project, Qiqihar University, it introduces winter construction process and winter maintenance, check calculating temperature of concrete according to Specification for Winter Construction of Building Engineering, which can be referred for construction of concrete in winter. The winter construction method of concrete structure is summarized in the severe cold region. The basic principles of comprehensive thermos method are described for the reinforced concrete structure in winter. The winter construction measures are defined further, such as reinforced works, the formwork works, in particular concrete works.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.