Abstract

An attempt has been made, may be first time in Saudi Arabia, to utilize power of the wind for pumping the water for remotely located inhabitants not connected with national power grid. Small turbines of 1–10kW have been chosen in conjunction with Goulds 45J model water pumps to produce energy from wind and pump water using the produced energy at Arar, Rawdat Ben Habbas and Juaymah localities in Saudi Arabia. Wind speed measurements made at different heights using 40m tall towers have been utilized in the present work. Higher wind speeds were noticed during summer time compared to winter time at all the locations. Both energy yield and cost of energy point of view, 2.5kW wind turbine from Proven was found to be most suitable for wind power generation at all sites. It is shown that annual total water pumping capacity of 30,000m3 is possible from a depth of total dynamic head of 50m when using 2.5kW Proven wind turbine with hub heights 15–40m at all three sites with cost of water pumping as low as 1.28US¢/m3.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.