Abstract

The augment of ecological shield and the progressive exhaustion of traditional fossil energy sources have increased the interests in integrating renewable energy sources into existing power system. Wind power is becoming worldwide a significant component of the power generation portfolio. Profuse literature have been reported for the thermal Unit Commitment (UC) solution. In this work, the UC problem has been formulated by integrating wind power generators along with thermal power system. The Wind Generator Integrated UC (WGIUC) problem is more complex in nature, that necessitates a promising optimization tool. Hence, the modern bio-inspired algorithm namely, Grey Wolf Optimization (GWO) algorithm has been chosen as the main optimization tool and real coded scheme has been incorporated to handle the operational constraints. The standard test systems are used to validate the potential of the GWO algorithm. Moreover, the ramp rate limits are also included in the mathematical WGIUC formulation. The simulation results prove that the intended algorithm has the capability of obtaining economical resolutions with good solution quality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.