Abstract

In this paper, a strategy is proposed in order to introduce in a realistic way wind generation into a transmission power system non sequential Monte Carlo adequacy study with economic dispatch. Thanks to the implemented solution, wind generation is consequently confronted to operational constraints related to high powered thermal units, nuclear parks or thermal machines with technical minimum value. Moreover, during each simulated system state, a DC load flow is also calculated in order to evaluate reinforcements optimizing the large scale integration of wind power production. The simulation tool modified during the present work is called Scanner© and is the property of Tractebel Engineering (Gaz de France – Suez) company. It has been here applied to an academic test system: the Roy Billinton Test System (RBTS).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.