Abstract

In Germany, most of logistic halls are constructed with precast reinforced concrete members. Nowadays, there is an increasing demand for logistic halls where the roof construction is to realize with a span of up to 60 m without any inner support. However, the production and the transport of 60 m long precast concrete members are only to perform under extraordinary difficulties. Therefore, it was necessary to develop another solution. The idea was to produce two separate precast concrete segments and to transport them to the site. At the site the segments are combined to the final girder by prestressing them together, resulting in a segmental girder with the requested span of 60 m. The paper provides information about the structural demands on the joint between the two segments and the carried-out experimental program.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.