Abstract

Zijinshan commercial bioheapleaching–SX–EW plant has been in operation since December 2005. 13.9million tonnes of low grade copper sulfide ore (Cu 0.38%) has been leached efficiently with an annual recovery of 80% in this distinct leaching system with high iron concentration, high temperature, high acidity and low microbial activity. This paper is to study the key factors which influence the heap operation in Zijinshan. Dissolution kinetics of diginite and covellite was carried out in acid ferric sulfate solution under controlled redox potential. Moreover, column bioleaching tests were conducted in the laboratory with raffinate from the plant. Both results showed that the main factors accelerating dissolution rate of Cu1.8S/CuS were mainly temperature and ferric concentration, while redox potential only had a slight positive effect. The present work provides an insight into mineral kinetics to understand this unique bioheapleaching operation and gives further information for optimization of the existing practices.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.