Abstract

Planned egress drills are required by building codes around the world, and are commonly used to both train occupants and assess evacuation procedures. However, capturing the idea of a “successful” drill is often difficult. Data from both drills and unplanned evacuations are often incomplete and unreliable, which raises a key question: How well-matched are planned egress drills and unplanned evacuations in terms of their properties and outcomes? That is, are drills a good model of evacuation? In this paper, we compare 93 planned egress drills and 23 unplanned evacuations, which occurred in Canadian office buildings over a span of four years. Our two main findings are that (1) planned egress drills differ from unplanned evacuations in terms of frequency, timing, and outcome (e.g., reported total evacuation time), and (2) the reported number of occupants correlates with total evacuation time. These findings motivate a discussion of the strengths and weaknesses of the current approach to data reporting, and we highlight potential implications for (and limitations of) the current drill model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.