Abstract

Projects have to meet interrelated time, cost and effectiveness goals. Surveys, such as CHAOS, consistently indicate that over 50% of the projects either significantly deviate from these goals or fail. Therefore, there is room for improvement in terms of project outcomes. This motivated us to explore improvement possibilities for the outcomes of design strategies that account for the interrelations between time, cost and effectiveness. We focus on a cost–effective (CE) design strategy that aspires to maximize the effectiveness-to-cost ratio (ECR) by deciding on: project schedules, resource allocations and a product performance level (i.e. effectiveness). We suggest a mathematical formulation to capture trade-offs between project scope decisions (such as project scheduling and resource allocations) and effectiveness. We conduct experiments, in which participants use a simulator to plan and execute a project according to the CE strategy with and without goals, based on solutions for the mathematical formulation. Contrary to some of the literature on goal-setting theory for complicated tasks, we found that appropriate goals improved the expected ECR while others did not have any impact. A better understanding of appropriate goal-setting in the context of project management may be important for improving projects outcomes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.