Abstract

This paper proposes a practical and devised method for designing the wheeling charge based on the embedded cost method. In setting up the wheeling charge, one of the most important items is recovering the invested cost. Because the marginal cost method has the disadvantages regarding the above point, the embedded cost method is focused in this paper. By applying the proposed method, the wheeling charge that reflects the use of transmission systems not only gives an incentive for the efficient operation of power systems but also achieve the recovery of the invested cost by electric utilities. In order to verify the proposed method, several simulations have been conducted on the IEEE 30-bus test system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call