Abstract

In mine planning problems, cutoff grade optimization defines a threshold at every time period such that material above this value is processed, and the rest is considered waste. In orebodies with multiple minerals, which occur in practice, the natural extension is to consider a cutoff surface. We show that in two dimensions the optimal solution is a line, and in n dimensions it is a hyperplane.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call