Abstract

This paper critically reviews theoretical and empirical research from planning, social psychology, and political science relevant to the siting of high-voltage transmission lines (HVTLs). Siting of new HVTLs is important to reducing the emissions of greenhouse gases from the electricity sector as well as meeting demands for reliable power. We synthesize existing research by developing a meso-level framework that integrates and extends existing individual-level theories to better account for the nested impact of social interactions and institutional variables on siting outcomes. We apply our framework to a HVTL case in California where community based opposition was effective due to the perceived high risk of the project and where trust in institutions was low. Statutory p for using existing right-of-ways, land use attributes, and political lobbying were also important in explaining the HVTL siting outcome.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.