Abstract
We observed Western Toad (Anaxyrus boreas) breeding from mid-May to late June, coincident with a reservoir rise of ≤1.2 m in Lake Cushman, Washington State. Breeding occurred at 5 sequentially inundated sites and included diverse habitats. Early-spawned clutch-strings remained attached to the lake bottom but became vertically suspended during the lake-level rise. Embryos and hatchlings nearest the bottom were in cooler water than those near the top. Development through hatchling stages took up to 40 d for early spawn. Locations of later spawning were shallower and warmer, and larval development progressed rapidly. Ultimately, the extended spawning season and varied sites and habitats may provide reproductive success resilience. Reservoir water-level management during Western Toad breeding and larval development may effect: (1) breeding habitat availability; (2) larval development rates; and (3) reproductive success.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.