Abstract
<p>The 2.5km long West Gate Bridge comprises an eastern and western concrete approach viaduct, 871m and 670m respectively in length either side of the 848m long cable stayed steel box girder main span section. The key objective with the West Gate Bridge Strengthening Project was to increase the number of lanes in each carriageway from 4 to 5 to reduce traffic congestion on the M1 Freeway.</p><p>With the bridge carrying over 170,000 vehicles per day, being a key link in the transport network around Melbourne and spanning the Yarra River, the entrance to Australia’s busiest port, the project was always going to be a logistical challenge. This paper describes these challenges and the extraordinary measures that were implemented for the work to be completed safely and economically.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.