Abstract

Lubricant leakage will inevitably occur during the working process of wellbore trajectory control tools. Even including the lubricant compensation system, serious leakage will still cause lacks lubrication of the internal mechanical structure as well as electronic system damaged by external infiltration fluid, especially when it comes to battery sub and other electronic equipment. Seal system leakage prediction method was presented based on the assumption of steady gap flow. It is assumed that there is a constant gap between the lip seal and the rotating shaft, the gap height is determined by oil film thickness, and the length of the gap was determined by the contact analysis using the Mooney–Rivlin constitutive model. The analysis results show that the contact length between the primary seal lip and the rotary shaft is about 0.1 mm under the condition of ensuring the contact between the deputy seal lip and the rotary shaft. The overall lubricant leakage finite element analysis model was established, and the relationship between the internal lubricant pressure of the tool and the total leakage was obtained. The results of analysis indicate that under the internal pressure of 0.03 MPa, the lubricant leakage is approximately 6 mL/h, which was verified by experiments.

Highlights

  • The wellbore trajectory control tool is a directional rotary steering drilling tool that goes down with the drill bit during work

  • If the leakage is serious, it will have a fatal impact on the electronic equipment such as the measurement and control system and battery sub, which will cause the tool to lose its function

  • According to the calculation model of the constant gap leakage amount, it is considered that the lubricant leakage is caused by the steady gap between the lip seal and the rotary shaft

Read more

Summary

Introduction

The wellbore trajectory control tool is a directional rotary steering drilling tool that goes down with the drill bit during work. Keywords Wellbore trajectory control tool, seal system, leakage analysis, gap flow, numerical simulation Because the sealing structure of the wellbore trajectory control tool is very complicated, some assumptions need to be made in order to analyze the leakage as follows:[10]

Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.