Abstract

Abstract An extended welltest was successfully performed on a deep, sour, high-pressure, high temperature remote onshore appraisal well using a permanent downhole monitoring system. Prior to the six-month extended test an initial test and stimulation treatment was performed on the well. The permanent monitoring system provided continuous pressure, temperature and rate measurement data in a technically challenging completion environment. Complete and accurate data was obtained on-line for performance monitoring, reservoir simulation and analytical test analysis. Unforeseen completion challenges and wellbore restrictions would have resulted in alternative conventional data collection methods yielding severely restricted data suites and test results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.